Leave a Message
Thank you for your message. We will be in touch with you shortly.
Explore Our Properties
Covered brick entry with a walnut door, limestone pilasters, black lanterns, and a paver court facing a tree-lined lawn.

Washington Township Well and Septic Inspections Before a Home Sale

September 17, 2026

Search "does Macomb County require a septic inspection to sell a house" and the answer that comes back most often is no. That answer is wrong for a meaningful slice of Washington Township, and a seller who trusts it can end up five days from closing with a county evaluation they haven't even scheduled yet, because the Macomb County Health Department requires the completed report at least five days before closing.

Here's the part that generic guides miss: Washington Township isn't one utility system. The township's Department of Public Works runs public water and sewer through specific developments and corridors, roughly 90 miles of water main and 70 miles of sanitary sewer by the department's own count. Outside those service lines, private wells and septic systems are common, especially on the larger parcels and newer builds along the township's rural edges, and those systems fall under Macomb County Health Department jurisdiction, not the township. That split is exactly where the online confusion starts, and it's exactly where a real closing date can slip.

What The Generic Guides Get Wrong

Most of the septic content you'll find ranks counties by whether they have a formally named Time of Transfer or Point of Sale ordinance. Counties with a heavy concentration of inland lakes and Great Lakes shoreline, places like Washtenaw, Grand Traverse, Emmet, and Charlevoix, show up on those lists because their programs carry that specific label. Macomb doesn't use that label, so it gets sorted into the "no requirement" bucket alongside counties that genuinely have none.

That sorting misses the actual rule. Macomb County Health Department has required evaluation of both well and septic systems before closing since a regulation took effect on August 1, 2002. Any purchase agreement involving a property with an on-site sewage or water supply system triggers it. The county doesn't frame this as a suggestion. It's a condition of the sale going through.

What you'll read online What Macomb County actually requires
"Macomb County has no mandatory inspection at sale" Any well or septic-served property must be evaluated by a registered evaluator or Macomb County Health Department staff before closing
"Timing is negotiable, schedule whenever works" The completed evaluation report must reach the county at least five days before closing
"Just get the tank pumped and inspected" The tank must be pumped with the evaluator on site, and it can't have been pumped within the 30 days beforehand
"One evaluation covers the sale" The evaluation is valid for one year from the date it's performed, not indefinitely

The Township Runs Two Systems, Not One

Current listings across Washington Township show this divide in real time. Larger parcels and land listings routinely carry a line noting the buyer will need to install well and septic, while homes closer to established subdivisions list city water and natural gas at the street. New construction reflects the same split. Builders active in the township right now, including M/I Homes, Eldorado Homes, and Acadia Home Builders, are building on both sides of that infrastructure line depending on the specific development and its distance from the public system.

That means the rule that applies to a given Washington Township sale isn't a township-wide fact. It depends entirely on which side of that boundary the parcel sits on. A buyer comparing two homes a mile apart could be looking at completely different closing requirements without ever knowing it, unless someone tells them.

Where The Timeline Actually Breaks

The evaluation itself isn't the hard part. The scheduling logistics around it are what catch sellers off guard, because they run on their own clock rather than the buyer's inspection period.

  • A tank pumped within 30 days of the county evaluation forces a delay, because the evaluator needs to see typical accumulation, not a freshly emptied tank.
  • A buried well head has to be exposed before an evaluator can assess it, which sometimes means arranging excavation before the visit can even be scheduled.
  • Missing well records, depth, age, diameter, or past service work, slow the process down and can push a report past the five-day submission window if nobody starts early.
  • Registered evaluators serving Macomb County, Craig Pletta of Qwest Inspect among them, can often get to a property within 48 hours of a request, but water sample results alone typically take two to three days to come back from the lab.

A tank pumped clean two weeks before the visit can push a closing date back just as easily as one that hasn't been touched in a decade.

Ten days of standard inspection contingency doesn't automatically cover this. The completed report still has to reach the county at least five days before closing.

The Financing Layer On Top

Even in a hypothetical world where Macomb's rule didn't exist, a seller working with an FHA or VA buyer would likely face something close to it anyway. According to SepticAndWell.com, both loan types typically require documentation that a well and septic system are functioning properly and positioned at an appropriate distance from each other before the lender will close. In Washington Township, where FHA and VA buyers are active in the same well-and-septic price range as conventional buyers, that overlap means the evaluation isn't really optional for anyone trying to reach the widest pool of offers.

A Rule That May Get Bigger, Not Smaller

Michigan Senate Bill 771 would set statewide septic evaluation standards tied to a system's age and its proximity to water, rather than tying evaluation only to a property transfer. It advanced out of Senate committee in June 2026 and is still waiting on floor action, so it isn't law and shouldn't be treated as settled.

Quick Questions

Does every home in Washington Township need this evaluation? No. Only properties served by a private well and/or septic system. Homes connected to the township's public water and sewer network aren't subject to the county's evaluation requirement.

Who is responsible for getting it done? Macomb County places that responsibility on the property owner. Who pays for it is a negotiation point between buyer and seller, the same way inspection costs often are.

How long does the evaluation stay valid? One year from the date it's completed, according to Macomb County Health Department.

What happens if the evaluation finds a problem? The county can require corrective action before the sale closes, which typically becomes a negotiation between buyer and seller over repairs or credits, similar to any other inspection contingency.

If you're weighing a well-and-septic property in Washington Township, whether it's a new build from one of the township's active builders or a longtime family home on a couple of acres, the timeline deserves the same attention as the price. BAS Group Real Estate builds that evaluation window into the contract from the first conversation, not the week before closing. Explore more about Washington Township or get a sense of what your property could be worth with a home valuation. Let's Connect.

This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.

Follow Us On Instagram